Design Review Board meeting on the old Fruit Stand blocks (LIVE COVERAGE)

Tonight, Monday, February 3, the Northeast Design Review Board will meet to decide the next steps for the development of the “old Fruit Stand block” just south of Roosevelt High School.

The meeting takes place at 6:30 PM at the University Heights Community Center (5031 University Way NE, Room 209). There is a public comment period during the meeting, but it is only 20 minutes in length and not for Q&A-style discussions.

Ravenna Blog will be in attendance and providing LIVE COVERAGE below, starting around 6:30 PM.

Page 12 from the Roosevelt Development Group's Design Review Recommendation presentation. Click the image to download the entire presentation (17 MB PDF)

Page 12 from the Roosevelt Development Group’s Design Review Recommendation presentation. Click the image to download the entire presentation (17 MB PDF)

The Roosevelt Development Group will be presenting their preferred project design (by Seattle architecture firm GGLO) for 6505 15th Avenue NE (Project #3013244) to the Northeast Design Review Board at tonight’s meeting.

Three different design schemes were presented during the early design guidance meeting on August 6, 2012. (You can find the notes from that meeting here.) Tonight’s recommendation phase design is the third of those three designs and features:

    • Approximately 221 dwelling units, in a mix of multi- and groun- level configurations;
    • 7,500-square-feet of ground-level commercial space;
    • 175 parking stalls, accessed from 14th Avenue NE;
    • Overall height of 7-stories (building heights ranging from 55 to 75 feet, depending on the slope of the property)

Jim O’Halloran, past Roosevelt Neighborhood Association Land Use Chair, had this to say about tonight’s meeting and the current design plans:

“Now that a zoning decision for the high school blocks has been made, and that a reasonably attractive building has been designed for the site with some engagement from the Community, let’s get on with it; build the building.  If for any reason the project will be further delayed, then it is important that the existing decrepit building structures be removed without further delay.  Allowing this sore spot to fester without near term improvement would surely undermine RDG’s relationship with the Community.”

Comments

  1. Andres Salomon says:

    The plan overall looks great. Would have been nice to see the design group’s plans/presentation specifically mention NE 66th as a greenway, but whatever. Catering to RHS access achieves the same thing.

    Thanks for covering this!

  2. Julie Jones says:

    With much less parking than residentual units will the residents be able to obtain a ZONE 19 parking permit and use the side streets where our homes have been for years, This can really get messy coming home after work and finding our spots taken up by some of the 221 residents.

  3. Paul Thackray says:

    Thank you for reporting on this!

  4. Hi there mates, its wonderful post regarding teachingand entirely explained, keep it up all the time.

  5. Market Rumor – women Defined as A Necessity At this time

Trackbacks

  1. […] The project is currently in the Review phase, and has been presented twice at Northeast Design Review meetings (Early Design Guidance meeting on August 6, 2012, and a Recommendation meeting on February 3, 2014). […]

  2. jordan 11 legend blue

    Amazing Philippine Islands Adventure Travel A michael kors bags rticles | July michael kors bags 20, 2009 The Phili cheap michael kors ppines consists cheap michael kors of 7,107 islands the north face black fridayEn among http://gwinnettcemetery.com t…

Leave a Reply to Ma2x Ma2x Telecharger Cancel reply